Pilgrim Pool Industrial Estate Pool Redruth, Cornwall, TR15 3RH
Pilgrim, Pool Industrial Estate - Solar Panels is a 0.82 MW solar farm project in South West. The applicant or operator on record is EDF Energy Renewables. Planning permission has been granted as of August 2022 and it is awaiting construction. The determining authority is Cornwalβ¦
Consented / Approved
Project stageConsented
PlanningJul 2022 (completed)
ConsentedAug 2022 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2022-07-25.
Registered planning capacity; not measured generation.
Pilgrim, Pool Industrial Estate - Solar Panels is a 0.82 MW solar farm project in South West. The applicant or operator on record is EDF Energy Renewables. Planning permission has been granted as of August 2022 and it is awaiting construction. The determining authority is Cornwall, reference PA22/06419.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.820 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
EDF Energy Renewables
Owner / operator
EDF Energy Renewables
Year consented
2022
Location
Pilgrim Pool Industrial Estate Pool Redruth, Cornwall, TR15 3RH