Hangar 125 Percival Way Luton, Bedfordshire, LU2 9LU
Percival Way - Solar Panels is a 0.47 MW solar farm project in Eastern. The applicant or operator on record is EDF Renewables Limited. Planning permission has been granted as of August 2022 and it is awaiting construction. The determining authority is Luton, reference 22/00732/PAβ¦
Consented / Approved
Project stageConsented
PlanningJun 2022 (completed)
ConsentedAug 2022 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2022-06-17.
Registered planning capacity; not measured generation.
Percival Way - Solar Panels is a 0.47 MW solar farm project in Eastern. The applicant or operator on record is EDF Renewables Limited. Planning permission has been granted as of August 2022 and it is awaiting construction. The determining authority is Luton, reference 22/00732/PAOSPE.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.470 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
EDF Renewables Limited
Owner / operator
EDF Renewables Limited
Year consented
2022
Location
Hangar 125 Percival Way Luton, Bedfordshire, LU2 9LU