Pentre Bach adjacent to Pentre Lane, Cwmbran, Torfaen, NP44

Pentre Bach Solar Farm is a 20 MW solar farm project in Wales. The applicant or operator on record is Elgin Energy EsCo Ltd. The scheme is currently in the planning system, submitted January 2025. The determining authority is Welsh Government (NSIP), reference DNS/3239190.…

In Planning
Project stageIn planning
  1. PlanningJan 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Application Submitted.

Official register: July 2026

Recorded status: Planning Application Submitted. Source record updated 2025-04-14.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

20.000 MW
Registered Capacity

πŸ“‹ Project Overview

Pentre Bach Solar Farm is a 20 MW solar farm project in Wales. The applicant or operator on record is Elgin Energy EsCo Ltd. The scheme is currently in the planning system, submitted January 2025. The determining authority is Welsh Government (NSIP), reference DNS/3239190.

Site Schematic

SUBSTATION ? ha Β· 20 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)20.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperElgin Energy EsCo Ltd
Owner / operatorElgin Energy EsCo Ltd
LocationPentre Bach adjacent to Pentre Lane, Cwmbran, Torfaen, NP44
RegionWales
Coordinates51.6244618Β°N, 3.0372844Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Storage Co-location REPD Ref ID18492
Mounting Type for SolarGround
Solar Site Area (sqm)467200

πŸ“… Project Timeline