Pencaitland Maltings - Boiler Hybrid Energy Centre

Pencaitland Maltings, Tranent, East Lothian, EH34 5DQ

Pencaitland Maltings - Boiler Hybrid Energy Centre is a 7 MW bioenergy / waste project in Scotland. The applicant or operator on record is Bairds Malt Limited. The scheme is currently in the planning system, submitted October 2024. The determining authority is East Lothian, refer…

In Planning
Project stageIn planning
  1. PlanningOct 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Application Submitted.

Official register: July 2026

Recorded status: Planning Application Submitted. Source record updated 2024-12-06.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

7.000 MW
Registered Capacity

πŸ“‹ Project Overview

Pencaitland Maltings - Boiler Hybrid Energy Centre is a 7 MW bioenergy / waste project in Scotland. The applicant or operator on record is Bairds Malt Limited. The scheme is currently in the planning system, submitted October 2024. The determining authority is East Lothian, reference 24/00877/P.

πŸ”§ Technical Specifications

Capacity (MW)7.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBairds Malt Limited
Owner / operatorBairds Malt Limited
LocationPencaitland Maltings, Tranent, East Lothian, EH34 5DQ
RegionScotland
Coordinates55.9090177Β°N, 2.9025562Β°W

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2024-10-11