Onshore Wind

Pen-Y-Fan Industrial Estate

Unit 4, Durisol UK, Parkway, Pen-Y-Fan Industrial Estate, Newport, Gwent, Caerphilly, NP11 3EF

Pen-Y-Fan Industrial Estate is a 1.8 MW onshore wind project in Wales. The applicant or operator on record is Sirius Renewable Energy. The planning application was refused. The determining authority is Caerphilly, reference 17/0864/FULL.…

Refused
Project stageRefused
  1. PlanningOct 2017 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2018-10-02.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.800 MW
Registered Capacity

πŸ“‹ Project Overview

Pen-Y-Fan Industrial Estate is a 1.8 MW onshore wind project in Wales. The applicant or operator on record is Sirius Renewable Energy. The planning application was refused. The determining authority is Caerphilly, reference 17/0864/FULL.

Site Schematic

WALES Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)1.800 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperSirius Renewable Energy
Owner / operatorSirius Renewable Energy
LocationUnit 4, Durisol UK, Parkway, Pen-Y-Fan Industrial Estate, Newport, Gwent, Caerphilly, NP11 3EF
RegionWales
Coordinates51.6941239Β°N, 3.1598462Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)1.75
No. of Turbines1
Height of Turbines (m)113

πŸ“… Project Timeline

2017-10-09