Pen Y Bryn Farm, Wind Turbine, Pen Y Bryn, Abergele, Clwyd, LL22 8BE
Pen Y Bryn Farm, Pen Y Bryn - Wind Turbine is a 0.85 MW onshore wind project in Wales. The applicant or operator on record is Constantine Wind Energy Limited. The planning application was refused. The determining authority is Conwy, reference 0/51012.β¦
Refused
Project stageRefused
PlanningAug 2023 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2024-01-18.
Registered planning capacity; not measured generation.
Pen Y Bryn Farm, Pen Y Bryn - Wind Turbine is a 0.85 MW onshore wind project in Wales. The applicant or operator on record is Constantine Wind Energy Limited. The planning application was refused. The determining authority is Conwy, reference 0/51012.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.850 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Constantine Wind Energy Limited
Owner / operator
Constantine Wind Energy Limited
Location