Peel Common Wastewater Treatme, Land off Newgate Lane, Peel Common, Fareham, Hampshire, Hampshire, PO14 2AH
Peel Common Waste Water Treatment Works is a 20 MW battery storage project in South East. The applicant or operator on record is Hampshire County Council (Southern Water/Enzygo). The application has been withdrawn or the scheme abandoned. The determining authority is Fareham, refβ¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningJul 2017 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Abandoned.
Official register: July 2026
Recorded status: Abandoned. Source record updated 2020-05-01.
Registered planning capacity; not measured generation.
Peel Common Waste Water Treatment Works is a 20 MW battery storage project in South East. The applicant or operator on record is Hampshire County Council (Southern Water/Enzygo). The application has been withdrawn or the scheme abandoned. The determining authority is Fareham, reference P/17/0886/CC.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
20.000 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Hampshire County Council (Southern Water/Enzygo)
Owner / operator
Hampshire County Council (Southern Water/Enzygo)
Location
Peel Common Wastewater Treatme, Land off Newgate Lane, Peel Common, Fareham, Hampshire, Hampshire, PO14 2AH