Partridge Hill Solar Farm is a 33 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Green Switch Solutions/Belvedere Energy Developments. Planning permission has been granted as of July 2016 and it is awaiting construction. The determining authority is Doncaster, reference 15/01268/FULM.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 33 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Green Switch Solutions/Belvedere Energy Developments |
| Owner / operator | Green Switch Solutions/Belvedere Energy Developments |
| Year consented | 2016 |
| Location | Partridge Hill Farm, High Common Lane, Austerfield, Doncaster, South Yorkshire, South Yorkshire, DN10 6HA |
| Region | Yorkshire and Humber |
| Coordinates | 53.4612589Β°N, 1.0163932Β°W |