πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Bioenergy / Waste

Parkwood Landfill

Warren Street Sheffield South Yorkshire, South Yorkshire

Parkwood Landfill is a 12.3 MW bioenergy / waste project in Yorkshire and Humber. The applicant or operator on record is City Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Sheffield, reference 97/01585/REM.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningOct 1997 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedDec 1997 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2010-02-03.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

12.300 MW
Registered Capacity

πŸ“‹ Project Overview

Parkwood Landfill is a 12.3 MW bioenergy / waste project in Yorkshire and Humber. The applicant or operator on record is City Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Sheffield, reference 97/01585/REM.

πŸ”§ Technical Specifications

Capacity (MW)12.300 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperCity Energy
Owner / operatorCity Energy
Year consented1997
LocationWarren Street Sheffield South Yorkshire, South Yorkshire
RegionYorkshire and Humber
Coordinates53.3893565Β°N, 1.4466336Β°W

Additional published register fields

Registered technologyEfW Incineration

πŸ“… Project Timeline

1997-10-22
1997-12-11