π Project Overview
Parkway Advanced Engineering Centre, New Road - Solar PV Panels is a solar farm project in South West. The applicant or operator on record is Bristol Energy. Planning permission has been granted as of September 2024 and it is awaiting construction. The determining authority is South Gloucestershire, reference P24/01905/PNRE.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Bristol Energy |
| Owner / operator | Bristol Energy |
| Year consented | 2024 |
| Location | Parkway Advanced Engineering Centre New Road Stoke Gifford, Gloucestershire, BS34 8SF |
| Region | South West |
| Coordinates | 51.5127104Β°N, 2.550119Β°W |
Additional published register fields
| Registered technology | Solar Photovoltaics |
|---|---|
| Mounting Type for Solar | Roof |