Palk Road, Bedhampton - Solar Panels is a 0.25 MW solar farm project in South East. The applicant or operator on record is Portsmouth Water. Planning permission has been granted as of January 2022 and it is awaiting construction. The determining authority is Havant, reference APPβ¦
Consented / Approved
Project stageConsented
PlanningOct 2021 (completed)
ConsentedJan 2022 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2021-11-11.
Registered planning capacity; not measured generation.
Palk Road, Bedhampton - Solar Panels is a 0.25 MW solar farm project in South East. The applicant or operator on record is Portsmouth Water. Planning permission has been granted as of January 2022 and it is awaiting construction. The determining authority is Havant, reference APP/21/01169.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.