OS Field 6800 Fence Dike Lane Scruton, North Yorkshire, DL7
Os Field 6800 Fence Dike Lane - Solar Farm is a 49.9 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Lightrock Power Limited. Planning permission has been granted as of June 2023 and it is awaiting construction. The determining authority is Nβ¦
Consented / Approved
Project stageConsented
PlanningMay 2021 (completed)
ConsentedJun 2023 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Appeal Granted.
Official register: July 2026
Recorded status: Appeal Granted. Source record updated 2023-06-30.
Registered planning capacity; not measured generation.
Os Field 6800 Fence Dike Lane - Solar Farm is a 49.9 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Lightrock Power Limited. Planning permission has been granted as of June 2023 and it is awaiting construction. The determining authority is North Yorkshire, reference 21/01362/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
49.900 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Lightrock Power Limited
Owner / operator
Lightrock Power Limited
Year consented
2023
Location
OS Field 6800 Fence Dike Lane Scruton, North Yorkshire, DL7