Orton Solar Farm is a 5 MW solar farm project in North West. The applicant or operator on record is New Energy for the World. The planning application was refused. The determining authority is Westmorland and Furness, reference 15/0667.…

Refused
Project stageRefused
  1. PlanningAug 2015 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2016-06-29.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

5.000 MW
Registered Capacity

πŸ“‹ Project Overview

Orton Solar Farm is a 5 MW solar farm project in North West. The applicant or operator on record is New Energy for the World. The planning application was refused. The determining authority is Westmorland and Furness, reference 15/0667.

Site Schematic

SUBSTATION ? ha Β· 5 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)5.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperNew Energy for the World
Owner / operatorNew Energy for the World
LocationLand Between M6 Carriageways, Orton, Penrith, Cumbria, CA10 3SB
RegionNorth West
Coordinates54.4499806Β°N, 2.6110817Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)140600

πŸ“… Project Timeline

2015-08-12