Ongar Landfill, Mill Lane, High Ongar, Essex, CM5 9RG
Ongar Landfill Ground mounted solar photovoltaic is a 8.8 MW solar farm project in Eastern. The applicant or operator on record is Infinis. The application has been withdrawn or the scheme abandoned. The determining authority is Brentwood, reference ESS/21/21/BRW.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningFeb 2021 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2022-05-03.
Registered planning capacity; not measured generation.
Ongar Landfill Ground mounted solar photovoltaic is a 8.8 MW solar farm project in Eastern. The applicant or operator on record is Infinis. The application has been withdrawn or the scheme abandoned. The determining authority is Brentwood, reference ESS/21/21/BRW.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
8.800 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Infinis
Owner / operator
Infinis
Location
Ongar Landfill, Mill Lane, High Ongar, Essex, CM5 9RG