Solar Farm

Ongar Landfill Ground mounted solar photovoltaic

Ongar Landfill, Mill Lane, High Ongar, Essex, CM5 9RG

Ongar Landfill Ground mounted solar photovoltaic is a 8.8 MW solar farm project in Eastern. The applicant or operator on record is Infinis. The application has been withdrawn or the scheme abandoned. The determining authority is Brentwood, reference ESS/21/21/BRW.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningFeb 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2022-05-03.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

8.800 MW
Registered Capacity

πŸ“‹ Project Overview

Ongar Landfill Ground mounted solar photovoltaic is a 8.8 MW solar farm project in Eastern. The applicant or operator on record is Infinis. The application has been withdrawn or the scheme abandoned. The determining authority is Brentwood, reference ESS/21/21/BRW.

Site Schematic

SUBSTATION ? ha Β· 8.8 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)8.800 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperInfinis
Owner / operatorInfinis
LocationOngar Landfill, Mill Lane, High Ongar, Essex, CM5 9RG
RegionEastern
Coordinates51.6963768Β°N, 0.2596001Β°E

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround

πŸ“… Project Timeline

2021-02-22