Off Old Trent Road, Beckingham, Doncaster, Nottinghamshire, DN10 4NR
Old Trent Road, Beckingham - Battery Storage Facility is a 80 MW battery storage project in East Midlands. The applicant or operator on record is Recell Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Bassetlaw, reference 23/01096/β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningSep 2023 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2025-03-04.
Registered planning capacity; not measured generation.
Old Trent Road, Beckingham - Battery Storage Facility is a 80 MW battery storage project in East Midlands. The applicant or operator on record is Recell Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Bassetlaw, reference 23/01096/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
80.000 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Recell Energy
Owner / operator
Recell Energy
Location
Off Old Trent Road, Beckingham, Doncaster, Nottinghamshire, DN10 4NR