West Side Of Old Teignmouth Road, Dawlish, Devon, EX7 0RT
Old Teignmouth Road - Micro Energy Storage Facility is a 0.2 MW battery storage project in South West. The applicant or operator on record is AMP Energy Services Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Teignbridge, referenβ¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningJul 2024 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2024-09-24.
Registered planning capacity; not measured generation.
Old Teignmouth Road - Micro Energy Storage Facility is a 0.2 MW battery storage project in South West. The applicant or operator on record is AMP Energy Services Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Teignbridge, reference 24/01127/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.200 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
AMP Energy Services Limited
Owner / operator
AMP Energy Services Limited
Location
West Side Of Old Teignmouth Road, Dawlish, Devon, EX7 0RT