πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Battery Storage

Old Teignmouth Road - Micro Energy Storage Facility

West Side Of Old Teignmouth Road, Dawlish, Devon, EX7 0RT

Old Teignmouth Road - Micro Energy Storage Facility is a 0.2 MW battery storage project in South West. The applicant or operator on record is AMP Energy Services Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Teignbridge, referen…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJul 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2024-09-24.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.200 MW
Power Capacity

πŸ“‹ Project Overview

Old Teignmouth Road - Micro Energy Storage Facility is a 0.2 MW battery storage project in South West. The applicant or operator on record is AMP Energy Services Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Teignbridge, reference 24/01127/FUL.

Site Schematic

GRID CONNECTION TRANSFORMER 33 kV DC BUSBAR 1234567891011121314151617181920 ? Γ— Battery Units

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.200 MW
Battery chemistryStand-alone Storage

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAMP Energy Services Limited
Owner / operatorAMP Energy Services Limited
LocationWest Side Of Old Teignmouth Road, Dawlish, Devon, EX7 0RT
RegionSouth West
Coordinates50.5717258Β°N, 3.4717995Β°W

Additional published register fields

Registered technologyBattery

πŸ“… Project Timeline

2024-07-05