Ne/O Old Schoolhouse, Barras, Stonehaven, Aberdeenshire, AB39 2XU
Old Schoolhouse, Barras - Battery Energy Storage System is a 49.9 MW battery storage project in Scotland. The applicant or operator on record is Green Switch Capital Limited. The scheme is currently in the planning system, submitted January 2025. The determining authority is Aberβ¦
In Planning
Project stageIn planning
PlanningJan 2025 (current stage)
Consented (not yet reached)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Application Submitted.
Official register: July 2026
Recorded status: Planning Application Submitted. Source record updated 2025-01-24.
Registered planning capacity; not measured generation.
Old Schoolhouse, Barras - Battery Energy Storage System is a 49.9 MW battery storage project in Scotland. The applicant or operator on record is Green Switch Capital Limited. The scheme is currently in the planning system, submitted January 2025. The determining authority is Aberdeenshire, reference APP/2024/2125.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
49.900 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Green Switch Capital Limited
Owner / operator
Green Switch Capital Limited
Location
Ne/O Old Schoolhouse, Barras, Stonehaven, Aberdeenshire, AB39 2XU