π Project Overview
Old Schoolhouse, Barras - Battery Energy Storage System is a 49.9 MW battery storage project in Scotland. The applicant or operator on record is Green Switch Capital Limited. The scheme is currently in the planning system, submitted January 2025. The determining authority is Aberdeenshire, reference APP/2024/2125.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 50 MW |
| Battery chemistry | Stand-alone Storage |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Green Switch Capital Limited |
| Owner / operator | Green Switch Capital Limited |
| Location | Ne/O Old Schoolhouse, Barras, Stonehaven, Aberdeenshire, AB39 2XU |
| Region | Scotland |
| Coordinates | 56.9146524Β°N, 2.2801981Β°W |