Land off, Godnow Road, Crowle, Humberside, DN17 4BN
Old River Don Wind Farm is a 18 MW onshore wind project in Yorkshire and Humber. The applicant or operator on record is REG Windpower. The planning application was refused. The determining authority is North Lincolnshire, reference WF/2014/0710.β¦
Refused
Project stageRefused
PlanningJun 2014 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2015-10-06.
Registered planning capacity; not measured generation.
Old River Don Wind Farm is a 18 MW onshore wind project in Yorkshire and Humber. The applicant or operator on record is REG Windpower. The planning application was refused. The determining authority is North Lincolnshire, reference WF/2014/0710.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
18.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
REG Windpower
Owner / operator
REG Windpower
Location
Land off, Godnow Road, Crowle, Humberside, DN17 4BN