Solar Farm

Old Dalkeith Road, Danderhall - Solar panels

NE/O Sheriffhall Park and Ride Easter Shawfair Danderhall, Midlothian, EH22 1FD

Old Dalkeith Road, Danderhall - Solar panels is a 0.15 MW solar farm project in Scotland. The applicant or operator on record is David Lloyd Leisure Limited. Planning permission has been granted as of April 2022 and it is awaiting construction. The determining authority is Midlot…

Consented / Approved
0 MW
Installed Capacity

πŸ“‹ Project Overview

Old Dalkeith Road, Danderhall - Solar panels is a 0.15 MW solar farm project in Scotland. The applicant or operator on record is David Lloyd Leisure Limited. Planning permission has been granted as of April 2022 and it is awaiting construction. The determining authority is Midlothian, reference 22/00200/DPP.

Site Schematic

SUBSTATION ? ha Β· 0.15 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperDavid Lloyd Leisure Limited
Owner / operatorDavid Lloyd Leisure Limited
Year consented2022
LocationNE/O Sheriffhall Park and Ride Easter Shawfair Danderhall, Midlothian, EH22 1FD
RegionScotland
Coordinates55.9064373Β°N, 3.0984759Β°W