OKEFORD FITZPAINE - SOLAR FARM is a 1.5 MW solar farm project in South West. The applicant or operator on record is Private Developer. The application has been withdrawn or the scheme abandoned. The determining authority is Dorset, reference 2/2012/0254/PLNG.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningMar 2012 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2012-06-21.
Registered planning capacity; not measured generation.
OKEFORD FITZPAINE - SOLAR FARM is a 1.5 MW solar farm project in South West. The applicant or operator on record is Private Developer. The application has been withdrawn or the scheme abandoned. The determining authority is Dorset, reference 2/2012/0254/PLNG.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.