Land At The Old Airfield Site Podington Airfield Airfield Road (Odell Glebe Solar Farm) Podington, Bedfordshire, NN29 7XA
Odell Glebe Solar Farm is a 16.8 MW solar farm project in Eastern. The applicant or operator on record is Vento Ludens. It is recorded as operational since March 2015. The determining authority is Bedford, reference 14/01333/MAF.β¦
OperationalΒ· Since 2015
Project stageOperating
PlanningJun 2014 (completed)
ConsentedSep 2014 (completed)
ConstructionDec 2014 (completed)
OperatingMar 2015 (current stage)
Closed (not yet reached)
Status in the official register: Operational.
Official register: July 2026
Recorded status: Operational. Source record updated 2015-04-15.
Registered planning capacity; not measured generation.
Odell Glebe Solar Farm is a 16.8 MW solar farm project in Eastern. The applicant or operator on record is Vento Ludens. It is recorded as operational since March 2015. The determining authority is Bedford, reference 14/01333/MAF.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
16.800 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Vento Ludens
Owner / operator
Vento Ludens
Year consented
2014
Construction started
2014
Commissioned / target
2015
Location
Land At The Old Airfield Site Podington Airfield Airfield Road (Odell Glebe Solar Farm) Podington, Bedfordshire, NN29 7XA