π Project Overview
Ocado Operating Limited, New Purfleet Road - Solar Panels is a 2.8 MW solar farm project in Eastern. The applicant or operator on record is Saber Renewable Energy Limited. Planning permission has been granted as of May 2025 and it is awaiting construction. The determining authority is Thurrock, reference 25/00243/PASOL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 3 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Saber Renewable Energy Limited |
| Owner / operator | Saber Renewable Energy Limited |
| Year consented | 2025 |
| Location | Ocado Operating Limited, New Purfleet Road, Aveley, South Ockendon, Essex, RM15 4EW |
| Region | Eastern |
| Coordinates | 51.4969516Β°N, 0.2332394Β°E |