Solar Farm

Oatcroft Fram, Titley - Solar PV Array

Oatcroft Fram, Titley, Kington, Herefordshire, HR5 3RU

Oatcroft Fram, Titley - Solar PV Array is a 30 MW solar farm project in West Midlands. The applicant or operator on record is Green Switch Capital Limited. The planning application was refused. The determining authority is Herefordshire, County of, reference P233578/F.…

Refused
Project stageRefused
  1. PlanningDec 2023 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2024-04-26.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

30.000 MW
Registered Capacity

πŸ“‹ Project Overview

Oatcroft Fram, Titley - Solar PV Array is a 30 MW solar farm project in West Midlands. The applicant or operator on record is Green Switch Capital Limited. The planning application was refused. The determining authority is Herefordshire, County of, reference P233578/F.

Site Schematic

SUBSTATION ? ha Β· 30 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)30.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperGreen Switch Capital Limited
Owner / operatorGreen Switch Capital Limited
LocationOatcroft Fram, Titley, Kington, Herefordshire, HR5 3RU
RegionWest Midlands
Coordinates52.2283351Β°N, 2.9891078Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)390000

πŸ“… Project Timeline

2023-12-04