Oakwood Farm is a 5 MW solar farm project in South East. The applicant or operator on record is Bowler Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Buckinghamshire, reference 14/00615/APP.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningMar 2014 (completed)
Withdrawn / abandoned (project stopped here)
ConsentedDec 2014 (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Abandoned.
Official register: July 2026
Recorded status: Abandoned. Source record updated 2016-10-25.
Registered planning capacity; not measured generation.
Oakwood Farm is a 5 MW solar farm project in South East. The applicant or operator on record is Bowler Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Buckinghamshire, reference 14/00615/APP.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.