Oakwood Business Park, Golden Cross, Chiddingly, Hailsham, East Sussex, BN27 4AH
Oakwood Business Park, Golden Cross - Solar Panels is a 0.85 MW solar farm project in South East. The applicant or operator on record is Challenge Packaging Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Wealden, reference WD/202β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningMar 2024 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2024-09-02.
Registered planning capacity; not measured generation.
Oakwood Business Park, Golden Cross - Solar Panels is a 0.85 MW solar farm project in South East. The applicant or operator on record is Challenge Packaging Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Wealden, reference WD/2024/0638/P12.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.850 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Challenge Packaging Limited
Owner / operator
Challenge Packaging Limited
Location
Oakwood Business Park, Golden Cross, Chiddingly, Hailsham, East Sussex, BN27 4AH