Battery Storage

Oakengates Leisure Centre, New Road - Micro Energy Storage Facility

Oakengates Leisure Centre, New Road, Wrockwardine Wood, Telford, Shropshire, TF2 7AB

Oakengates Leisure Centre, New Road - Micro Energy Storage Facility is a 0.2 MW battery storage project in West Midlands. The applicant or operator on record is AMP Clean Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Telford and …

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningNov 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2025-02-10.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.200 MW
Power Capacity

πŸ“‹ Project Overview

Oakengates Leisure Centre, New Road - Micro Energy Storage Facility is a 0.2 MW battery storage project in West Midlands. The applicant or operator on record is AMP Clean Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Telford and Wrekin, reference TWC/2024/0834.

Site Schematic

GRID CONNECTION TRANSFORMER 33 kV DC BUSBAR 1234567891011121314151617181920 ? Γ— Battery Units

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.200 MW
Battery chemistryStand-alone Storage

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAMP Clean Energy
Owner / operatorAMP Clean Energy
LocationOakengates Leisure Centre, New Road, Wrockwardine Wood, Telford, Shropshire, TF2 7AB
RegionWest Midlands
Coordinates52.7078896Β°N, 2.4449116Β°W

Additional published register fields

Registered technologyBattery

πŸ“… Project Timeline

2024-11-13