Oakengates Leisure Centre, New Road, Wrockwardine Wood, Telford, Shropshire, TF2 7AB
Oakengates Leisure Centre, New Road - Micro Energy Storage Facility is a 0.2 MW battery storage project in West Midlands. The applicant or operator on record is AMP Clean Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Telford and β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningNov 2024 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2025-02-10.
Registered planning capacity; not measured generation.
Oakengates Leisure Centre, New Road - Micro Energy Storage Facility is a 0.2 MW battery storage project in West Midlands. The applicant or operator on record is AMP Clean Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Telford and Wrekin, reference TWC/2024/0834.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.200 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
AMP Clean Energy
Owner / operator
AMP Clean Energy
Location
Oakengates Leisure Centre, New Road, Wrockwardine Wood, Telford, Shropshire, TF2 7AB