Land Near Nutsgrove Farm, Scolding Drove, Thorney, Peterborough, Cambridgeshire, PE6 0TP
Nutsgrove Wind Farm is a 14.4 MW onshore wind project in Eastern. The applicant or operator on record is WPR Wind Ltd. The application has been withdrawn or the scheme abandoned. The determining authority is Peterborough, reference 06/01051/FUL.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningJul 2006 (completed)
Withdrawn / abandoned (project stopped here)
ConsentedApr 2010 (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Abandoned.
Official register: July 2026
Recorded status: Abandoned. Source record updated 2016-04-01.
Registered planning capacity; not measured generation.
Nutsgrove Wind Farm is a 14.4 MW onshore wind project in Eastern. The applicant or operator on record is WPR Wind Ltd. The application has been withdrawn or the scheme abandoned. The determining authority is Peterborough, reference 06/01051/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
14.400 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
WPR Wind Ltd
Owner / operator
WPR Wind Ltd
Year consented
2010
Location
Land Near Nutsgrove Farm, Scolding Drove, Thorney, Peterborough, Cambridgeshire, PE6 0TP