Onshore Wind

Nutsgrove Wind Farm

Land Near Nutsgrove Farm, Scolding Drove, Thorney, Peterborough, Cambridgeshire, PE6 0TP

Nutsgrove Wind Farm is a 14.4 MW onshore wind project in Eastern. The applicant or operator on record is WPR Wind Ltd. The application has been withdrawn or the scheme abandoned. The determining authority is Peterborough, reference 06/01051/FUL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJul 2006 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedApr 2010 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2016-04-01.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

14.400 MW
Registered Capacity

πŸ“‹ Project Overview

Nutsgrove Wind Farm is a 14.4 MW onshore wind project in Eastern. The applicant or operator on record is WPR Wind Ltd. The application has been withdrawn or the scheme abandoned. The determining authority is Peterborough, reference 06/01051/FUL.

Site Schematic

EASTERN Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)14.400 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperWPR Wind Ltd
Owner / operatorWPR Wind Ltd
Year consented2010
LocationLand Near Nutsgrove Farm, Scolding Drove, Thorney, Peterborough, Cambridgeshire, PE6 0TP
RegionEastern
Coordinates52.6448805Β°N, 0.0414964Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)2
No. of Turbines7

πŸ“… Project Timeline

2006-07-07
2010-04-01