πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Norton Bottoms

Land at Norton Bottoms, Fleet Bridge Road, Portrack Interchange Business, Stockton-On-Tees, County Durham, TS18 2AD

Norton Bottoms is a 5 MW solar farm project in North East. The applicant or operator on record is Billingham Valley Developments. The application has been withdrawn or the scheme abandoned. The determining authority is Stockton-on-Tees, reference 16/0431/OUT.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningFeb 2016 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2017-03-31.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

5.000 MW
Registered Capacity

πŸ“‹ Project Overview

Norton Bottoms is a 5 MW solar farm project in North East. The applicant or operator on record is Billingham Valley Developments. The application has been withdrawn or the scheme abandoned. The determining authority is Stockton-on-Tees, reference 16/0431/OUT.

Site Schematic

SUBSTATION ? ha Β· 5 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)5.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBillingham Valley Developments
Owner / operatorBillingham Valley Developments
LocationLand at Norton Bottoms, Fleet Bridge Road, Portrack Interchange Business, Stockton-On-Tees, County Durham, TS18 2AD
RegionNorth East
Coordinates54.5839016Β°N, 1.287421Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)346000

πŸ“… Project Timeline

2016-02-18