Northpoint, Compass Park - Solar Panels is a 0.16 MW solar farm project in South East. The applicant or operator on record is RAAFT. The planning application was refused. The determining authority is Rother, reference RR/2025/636/PN2.β¦
Refused
Project stageRefused
PlanningJun 2025 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2026-01-22.
Registered planning capacity; not measured generation.
Northpoint, Compass Park - Solar Panels is a 0.16 MW solar farm project in South East. The applicant or operator on record is RAAFT. The planning application was refused. The determining authority is Rother, reference RR/2025/636/PN2.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.160 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
RAAFT
Owner / operator
RAAFT
Location
Northpoint, Second Floor, Compass Park, Staplecross, Ewhurst, East Sussex, TN32 5BS