Northfleet Mill, Crete Hall Road - Green Hydrogen Electrolyser is a 20 MW conventional hydro project in South East. The applicant or operator on record is HYRO Energy Limited (Octopus & RES). The scheme is currently in the planning system, submitted September 2023. The determinin…

In Planning
20 MW
Installed Capacity

πŸ“‹ Project Overview

Northfleet Mill, Crete Hall Road - Green Hydrogen Electrolyser is a 20 MW conventional hydro project in South East. The applicant or operator on record is HYRO Energy Limited (Octopus & RES). The scheme is currently in the planning system, submitted September 2023. The determining authority is Gravesham, reference 20230906.

Site Schematic

UPPER RES. LOWER RES. PENSTOCK TAILRACE GEN. GRID HEAD: ?m Β· POWER: 20 MW Β· ? turbines

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)20 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperHYRO Energy Limited (Octopus & RES)
Owner / operatorHYRO Energy Limited (Octopus & RES)
Year consented2024
LocationKimberly Clark Ltd Northfleet Mill Crete Hall Road Northfleet Gravesend, Kent, DA11 9AD
RegionSouth East
Coordinates51.4441647Β°N, 0.3391575Β°E

πŸ“… Project Timeline