πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Bioenergy / Waste

North West Biogas Anaerobic Digestion Plant (Waste AD)

West Road, Hillhouse International Business Park, Thornton Cleveleys,, Lancashire, FY5 4QD

North West Biogas Anaerobic Digestion Plant (Waste AD) is a 2 MW bioenergy / waste project in North West. The applicant or operator on record is Northwest Biogas. The application has been withdrawn or the scheme abandoned. The determining authority is Wyre, reference 09/00787/LCC…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningSep 2009 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedOct 2009 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2011-12-14.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.000 MW
Registered Capacity

πŸ“‹ Project Overview

North West Biogas Anaerobic Digestion Plant (Waste AD) is a 2 MW bioenergy / waste project in North West. The applicant or operator on record is Northwest Biogas. The application has been withdrawn or the scheme abandoned. The determining authority is Wyre, reference 09/00787/LCC.

πŸ”§ Technical Specifications

Capacity (MW)2.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperNorthwest Biogas
Owner / operatorNorthwest Biogas
Year consented2009
LocationWest Road, Hillhouse International Business Park, Thornton Cleveleys,, Lancashire, FY5 4QD
RegionNorth West
Coordinates53.8831428Β°N, 3.0007405Β°W

Additional published register fields

Registered technologyAnaerobic Digestion

πŸ“… Project Timeline

2009-09-30
2009-10-29