The North East Side Of Glen Road, Plympton, Plymouth, Devon, PL7 2DY
North East Side Of Glen Road, Plympton - Micro Energy Storage is a 0.2 MW battery storage project in South West. The applicant or operator on record is AMP Clean Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Plymouth, reference β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningApr 2026 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2026-07-13.
Registered planning capacity; not measured generation.
North East Side Of Glen Road, Plympton - Micro Energy Storage is a 0.2 MW battery storage project in South West. The applicant or operator on record is AMP Clean Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Plymouth, reference 26/00586/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.200 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
AMP Clean Energy
Owner / operator
AMP Clean Energy
Location
The North East Side Of Glen Road, Plympton, Plymouth, Devon, PL7 2DY