Manor Farm, North Cray Road, Sidcup, Kent, DA14 5HE
North Cray Road - Battery Energy Storage System is a 200 MW battery storage project in London. The applicant or operator on record is Firstway Energy. The planning application was refused. The determining authority is Bexley, reference 25/00833/FULM.β¦
Refused
Project stageRefused
PlanningApr 2025 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2026-01-06.
Registered planning capacity; not measured generation.
North Cray Road - Battery Energy Storage System is a 200 MW battery storage project in London. The applicant or operator on record is Firstway Energy. The planning application was refused. The determining authority is Bexley, reference 25/00833/FULM.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
200.000 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Firstway Energy
Owner / operator
Firstway Energy
Location
Manor Farm, North Cray Road, Sidcup, Kent, DA14 5HE