Land 2000 Metres North Of Calliachar Wind Farm, Amulree, Tayside
North Calliachar Wind Farm is a 21 MW onshore wind project in Scotland. The applicant or operator on record is I & H Brown NC Ltd. The application has been withdrawn or the scheme abandoned. The determining authority is Perth and Kinross, reference 13/00653/FLM.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningApr 2013 (completed)
Withdrawn / abandoned (project stopped here)
ConsentedMar 2015 (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Abandoned.
Official register: July 2026
Recorded status: Abandoned. Source record updated 2019-03-28.
Registered planning capacity; not measured generation.
North Calliachar Wind Farm is a 21 MW onshore wind project in Scotland. The applicant or operator on record is I & H Brown NC Ltd. The application has been withdrawn or the scheme abandoned. The determining authority is Perth and Kinross, reference 13/00653/FLM.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
21.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
I & H Brown NC Ltd
Owner / operator
I & H Brown NC Ltd
Year consented
2015
Location
Land 2000 Metres North Of Calliachar Wind Farm, Amulree, Tayside