East of Battens Farm, Allington, Wiltshire, SN14 7BY
North Allington Solar Farm - Solar Farm is a 10 MW solar farm project in South West. The applicant or operator on record is Noventum Power Limited. Planning permission has been granted as of September 2025 and it is awaiting construction. The determining authority is Wiltshire, β¦
Consented / Approved
Project stageConsented
PlanningOct 2024 (completed)
ConsentedSep 2025 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2026-01-26.
Registered planning capacity; not measured generation.
North Allington Solar Farm - Solar Farm is a 10 MW solar farm project in South West. The applicant or operator on record is Noventum Power Limited. Planning permission has been granted as of September 2025 and it is awaiting construction. The determining authority is Wiltshire, reference PL/2024/09410.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
10.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Noventum Power Limited
Owner / operator
Noventum Power Limited
Year consented
2025
Location
East of Battens Farm, Allington, Wiltshire, SN14 7BY