Solar Farm

Nigg Waste Water Plant, Coast Road - Solar PV Arrays

Nigg Waste Water Plant Coast Road, Aberdeenshire, AB11 8QX

Nigg Waste Water Plant, Coast Road - Solar PV Arrays is a 1.13 MW solar farm project in Scotland. The applicant or operator on record is Scottish Water Horizons. Planning permission has been granted as of September 2023 and it is awaiting construction. The determining authority i…

Consented / Approved
Project stageConsented
  1. PlanningAug 2023 (completed)
  2. ConsentedSep 2023 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2023-10-27.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.130 MW
Registered Capacity

πŸ“‹ Project Overview

Nigg Waste Water Plant, Coast Road - Solar PV Arrays is a 1.13 MW solar farm project in Scotland. The applicant or operator on record is Scottish Water Horizons. Planning permission has been granted as of September 2023 and it is awaiting construction. The determining authority is Aberdeen City, reference 230941/DPP.

Site Schematic

SUBSTATION ? ha Β· 1.13 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)1.130 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperScottish Water Horizons
Owner / operatorScottish Water Horizons
Year consented2023
LocationNigg Waste Water Plant Coast Road, Aberdeenshire, AB11 8QX
RegionScotland
Coordinates57.1321833Β°N, 2.0614357Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof
Solar Site Area (sqm)9800

πŸ“… Project Timeline

2023-08-02
2023-09-15