πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Newlands Farm Solar

between Fareham and Stubbington, Portsmouth, Hampshire

Newlands Farm Solar is a 49 MW solar farm project in South East. The applicant or operator on record is Sunsave 10 (FAREHAM) / Vogt Solar. The scheme is currently in the planning system, submitted October 2012. The determining authority is Fareham, reference P/12/0905/FP.…

Revised
Project stageSuperseded by a new application
  1. PlanningOct 2012 (completed)
  2. Superseded by a new application (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Revised.

Official register: July 2026

Recorded status: Revised. Source record updated 2013-02-21.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

49.000 MW
Registered Capacity

πŸ“‹ Project Overview

Newlands Farm Solar is a 49 MW solar farm project in South East. The applicant or operator on record is Sunsave 10 (FAREHAM) / Vogt Solar. The scheme is currently in the planning system, submitted October 2012. The determining authority is Fareham, reference P/12/0905/FP.

Site Schematic

SUBSTATION ? ha Β· 49 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)49.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperSunsave 10 (FAREHAM) / Vogt Solar
Owner / operatorSunsave 10 (FAREHAM) / Vogt Solar
Locationbetween Fareham and Stubbington, Portsmouth, Hampshire
RegionSouth East
Coordinates50.8310976Β°N, 1.1970874Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Are they re-applying (New REPD Ref)1362
Solar Site Area (sqm)280000

πŸ“… Project Timeline

2012-10-29