Newhouse Farm, Canaston Bridge - Wind Turbines is a 3 MW onshore wind project in Wales. The applicant or operator on record is Slebech Investment Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Pembrokeshire, reference 25/0196/PA.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningJun 2025 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2025-11-07.
Registered planning capacity; not measured generation.
Newhouse Farm, Canaston Bridge - Wind Turbines is a 3 MW onshore wind project in Wales. The applicant or operator on record is Slebech Investment Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Pembrokeshire, reference 25/0196/PA.