πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Battery Storage

New South Farm, Piper Lane - Solar Farm

New South Farm, Piper Lane, Aston, Sheffield, South Yorkshire, S26 2EF

New South Farm, Piper Lane - Solar Farm is a 11.97 MW battery storage project in Yorkshire and Humber. The applicant or operator on record is Abei Energy Group. The scheme is currently in the planning system, submitted December 2024. The determining authority is Rotherham, refere…

In Planning
Project stageIn planning
  1. PlanningDec 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Application Submitted.

Official register: July 2026

Recorded status: Planning Application Submitted. Source record updated 2025-01-24.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

11.970 MW
Power Capacity

πŸ“‹ Project Overview

New South Farm, Piper Lane - Solar Farm is a 11.97 MW battery storage project in Yorkshire and Humber. The applicant or operator on record is Abei Energy Group. The scheme is currently in the planning system, submitted December 2024. The determining authority is Rotherham, reference RB2025/0029.

Site Schematic

GRID CONNECTION TRANSFORMER 33 kV DC BUSBAR 1234567891011121314151617181920 ? Γ— Battery Units

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)11.970 MW
Battery chemistryCo-located with RE

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAbei Energy Group
Owner / operatorAbei Energy Group
LocationNew South Farm, Piper Lane, Aston, Sheffield, South Yorkshire, S26 2EF
RegionYorkshire and Humber
Coordinates53.3648694Β°N, 1.2990938Β°W

Additional published register fields

Registered technologyBattery
Storage Co-location REPD Ref ID15653

πŸ“… Project Timeline

2024-12-24