New South Farm, Piper Lane, Aston, Sheffield, South Yorkshire, S26 2EF
New South Farm, Piper Lane - Solar Farm is a 31.2 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Abei Energy Group. The scheme is currently in the planning system, submitted December 2024. The determining authority is Rotherham, reference RBβ¦
In Planning
Project stageIn planning
PlanningDec 2024 (current stage)
Consented (not yet reached)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Application Submitted.
Official register: July 2026
Recorded status: Planning Application Submitted. Source record updated 2025-01-24.
Registered planning capacity; not measured generation.
New South Farm, Piper Lane - Solar Farm is a 31.2 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Abei Energy Group. The scheme is currently in the planning system, submitted December 2024. The determining authority is Rotherham, reference RB2025/0029.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
31.200 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Abei Energy Group
Owner / operator
Abei Energy Group
Location
New South Farm, Piper Lane, Aston, Sheffield, South Yorkshire, S26 2EF