πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

New South Farm, Piper Lane - Solar Farm

New South Farm, Piper Lane, Aston, Sheffield, South Yorkshire, S26 2EF

New South Farm, Piper Lane - Solar Farm is a 31.2 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Abei Energy Group. The scheme is currently in the planning system, submitted December 2024. The determining authority is Rotherham, reference RB…

In Planning
31 MW
Installed Capacity

πŸ“‹ Project Overview

New South Farm, Piper Lane - Solar Farm is a 31.2 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Abei Energy Group. The scheme is currently in the planning system, submitted December 2024. The determining authority is Rotherham, reference RB2025/0029.

Site Schematic

SUBSTATION ? ha Β· 31.2 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)31 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAbei Energy Group
Owner / operatorAbei Energy Group
LocationNew South Farm, Piper Lane, Aston, Sheffield, South Yorkshire, S26 2EF
RegionYorkshire and Humber
Coordinates53.3648694Β°N, 1.2990939Β°W

πŸ“… Project Timeline