New Rides Farm - Photovoltaic Panels is a 10 MW solar farm project in South East. The applicant or operator on record is EnergieKontor UK Limited. Planning permission has been granted as of September 2021 and it is awaiting construction. The determining authority is Swale, refereβ¦
Consented / Approved
Project stageConsented
PlanningJun 2021 (completed)
ConsentedSep 2021 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2026-02-17.
Registered planning capacity; not measured generation.
New Rides Farm - Photovoltaic Panels is a 10 MW solar farm project in South East. The applicant or operator on record is EnergieKontor UK Limited. Planning permission has been granted as of September 2021 and it is awaiting construction. The determining authority is Swale, reference 21/503240/FULL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.