Bioenergy / Waste

New Inn AD (Waste AD)

Pont-y-felin Industrial Estate, New Road, Panteg, Pontypool, Gwent, NP4 0SH

New Inn AD (Waste AD) is a 2.4 MW bioenergy / waste project in Wales. The applicant or operator on record is Shanks Group. The planning application was refused. The determining authority is Torfaen, reference 12/P/00100.…

Refused
Project stageRefused
  1. PlanningFeb 2012 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2013-12-04.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.400 MW
Registered Capacity

πŸ“‹ Project Overview

New Inn AD (Waste AD) is a 2.4 MW bioenergy / waste project in Wales. The applicant or operator on record is Shanks Group. The planning application was refused. The determining authority is Torfaen, reference 12/P/00100.

πŸ”§ Technical Specifications

Capacity (MW)2.400 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperShanks Group
Owner / operatorShanks Group
LocationPont-y-felin Industrial Estate, New Road, Panteg, Pontypool, Gwent, NP4 0SH
RegionWales
Coordinates51.6827832Β°N, 3.0123058Β°W

Additional published register fields

Registered technologyAnaerobic Digestion

πŸ“… Project Timeline

2012-02-28