New Alderley House, Victoria Road, Macclesfield, Cheshire, SK10 3BL
New Alderley House, Hope Drive - Solar PV System is a 0.15 MW solar farm project in North West. The applicant or operator on record is Primary Health Properties Limited. The planning application was refused. The determining authority is Cheshire East, reference 23/3392M.β¦
Refused
Project stageRefused
PlanningSep 2023 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2023-11-03.
Registered planning capacity; not measured generation.
New Alderley House, Hope Drive - Solar PV System is a 0.15 MW solar farm project in North West. The applicant or operator on record is Primary Health Properties Limited. The planning application was refused. The determining authority is Cheshire East, reference 23/3392M.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.150 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Primary Health Properties Limited
Owner / operator
Primary Health Properties Limited
Location
New Alderley House, Victoria Road, Macclesfield, Cheshire, SK10 3BL