Nevis Power Station

South Dock, Newport,, Gwent, NP20

Nevis Power Station is a 49.9 MW bioenergy / waste project in Wales. The applicant or operator on record is Welsh Power/ Power Cymru (Carron Energy). The application has been withdrawn or the scheme abandoned. The determining authority is Newport, reference 08/1257.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningSep 2008 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedJan 2009 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2016-06-24.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

49.900 MW
Registered Capacity

πŸ“‹ Project Overview

Nevis Power Station is a 49.9 MW bioenergy / waste project in Wales. The applicant or operator on record is Welsh Power/ Power Cymru (Carron Energy). The application has been withdrawn or the scheme abandoned. The determining authority is Newport, reference 08/1257.

πŸ”§ Technical Specifications

Capacity (MW)49.900 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperWelsh Power/ Power Cymru (Carron Energy)
Owner / operatorWelsh Power/ Power Cymru (Carron Energy)
Year consented2009
LocationSouth Dock, Newport,, Gwent, NP20
RegionWales
Coordinates51.5520476Β°N, 2.9909821Β°W

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2008-09-30
2009-01-07