Neuadd Goch Bank Wind Farm is a 27 MW onshore wind project in Wales. The applicant or operator on record is RWE Npower Renewables. The application has been withdrawn or the scheme abandoned. The determining authority is Powys, reference P/2012/0040.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningJan 2012 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Appeal Withdrawn.
Official register: July 2026
Recorded status: Appeal Withdrawn. Source record updated 2020-03-26.
Registered planning capacity; not measured generation.
Neuadd Goch Bank Wind Farm is a 27 MW onshore wind project in Wales. The applicant or operator on record is RWE Npower Renewables. The application has been withdrawn or the scheme abandoned. The determining authority is Powys, reference P/2012/0040.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.