Conventional Hydro

Netham Weir

Land At Rear Of, St Vincents Trading Estate, Feeder Road, Bristol, Avon, Avon, BS2 0UY

Netham Weir is a 0.4 MW conventional hydro project in South West. The applicant or operator on record is Bristol Energy Cooperative. The planning permission has expired. The determining authority is Bristol, City of, reference 18/05891/F.…

Expired
Project stageConsent lapsed
  1. PlanningNov 2018 (completed)
  2. ConsentedJan 2019 (completed)
  3. Consent lapsed (project stopped here)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Expired.

Official register: July 2026

Recorded status: Planning Permission Expired. Source record updated 2020-03-23.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.400 MW
Registered Capacity

πŸ“‹ Project Overview

Netham Weir is a 0.4 MW conventional hydro project in South West. The applicant or operator on record is Bristol Energy Cooperative. The planning permission has expired. The determining authority is Bristol, City of, reference 18/05891/F.

Site Schematic

UPPER RES. LOWER RES. PENSTOCK TAILRACE GEN. GRID HEAD: ?m Β· POWER: 0.400 MW Β· ? turbines

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.400 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBristol Energy Cooperative
Owner / operatorBristol Energy Cooperative
Year consented2019
LocationLand At Rear Of, St Vincents Trading Estate, Feeder Road, Bristol, Avon, Avon, BS2 0UY
RegionSouth West
Coordinates51.4509954Β°N, 2.5551617Β°W

Additional published register fields

Registered technologySmall Hydro

πŸ“… Project Timeline

2018-11-16
2019-01-17