πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Onshore Wind

Nant Bach

Mwdwl Eithin near Llanfihangel Glyn Myfyr, Conwy, Gwynedd

Nant Bach is a 27.5 MW onshore wind project in Wales. The applicant or operator on record is Vattenfall. The application has been withdrawn or the scheme abandoned. The determining authority is Conwy, reference 0/35170.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJul 2008 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedMar 2009 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2015-08-18.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

27.500 MW
Registered Capacity

πŸ“‹ Project Overview

Nant Bach is a 27.5 MW onshore wind project in Wales. The applicant or operator on record is Vattenfall. The application has been withdrawn or the scheme abandoned. The determining authority is Conwy, reference 0/35170.

Site Schematic

WALES Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)27.500 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperVattenfall
Owner / operatorVattenfall
Year consented2009
LocationMwdwl Eithin near Llanfihangel Glyn Myfyr, Conwy, Gwynedd
RegionWales
Coordinates53.2005506Β°N, 3.7604915Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)2.5
No. of Turbines11
Are they re-applying (Old REPD Ref) 3044

πŸ“… Project Timeline

2008-07-12
2009-03-11