Nanhoron Estate

Nanhoron Estate, Botwnnog, Pwllheli, Gwynedd, Wales, Gwynedd, LL53 8DP

Nanhoron Estate is a 5 MW solar farm project in Wales. The applicant or operator on record is Belectric (Big 60 Million). The application has been withdrawn or the scheme abandoned. The determining authority is Gwynedd, reference C15/0793/32/LL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningNov 2015 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedNov 2016 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2019-10-23.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

5.000 MW
Registered Capacity

πŸ“‹ Project Overview

Nanhoron Estate is a 5 MW solar farm project in Wales. The applicant or operator on record is Belectric (Big 60 Million). The application has been withdrawn or the scheme abandoned. The determining authority is Gwynedd, reference C15/0793/32/LL.

Site Schematic

SUBSTATION ? ha Β· 5 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)5.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBelectric (Big 60 Million)
Owner / operatorBelectric (Big 60 Million)
Year consented2016
LocationNanhoron Estate, Botwnnog, Pwllheli, Gwynedd, Wales, Gwynedd, LL53 8DP
RegionWales
Coordinates52.8484275Β°N, 4.5787878Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)127000

πŸ“… Project Timeline

2015-11-23
2016-11-30