Nackington Farm Solar Park- Site C is a 12 MW solar farm project in South East. The applicant or operator on record is Green Energy UK Direct Ltd. The application has been withdrawn or the scheme abandoned. The determining authority is Canterbury, reference CA//14/00085.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningJan 2014 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2014-09-16.
Registered planning capacity; not measured generation.
Nackington Farm Solar Park- Site C is a 12 MW solar farm project in South East. The applicant or operator on record is Green Energy UK Direct Ltd. The application has been withdrawn or the scheme abandoned. The determining authority is Canterbury, reference CA//14/00085.