Mynydd James Wind Farm is a 31.2 MW onshore wind project in Wales. The applicant or operator on record is Pennant Wind Energy Ventures Limited Walters Group. The application has been withdrawn or the scheme abandoned. The determining authority is Blaenau Gwent, reference 2003/049β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningJul 2006 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2005-10-26.
Registered planning capacity; not measured generation.
Mynydd James Wind Farm is a 31.2 MW onshore wind project in Wales. The applicant or operator on record is Pennant Wind Energy Ventures Limited Walters Group. The application has been withdrawn or the scheme abandoned. The determining authority is Blaenau Gwent, reference 2003/0494.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
31.200 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Pennant Wind Energy Ventures Limited Walters Group
Owner / operator
Pennant Wind Energy Ventures Limited Walters Group